Transaction Certification Center
Phase 12Certification proves a transaction is ready before closing activities proceed. It never changes transaction state, never closes transactions and never moves money.
Transaction certification
24 certified / 148
10 certification inputs evaluated per file
Closing readiness
31 ready
9 pre-closing evidence classes
Operational readiness
0.74
7 operational dimensions, 90d
Compliance readiness
0.68
6 compliance certification checks
Dependency readiness
9 verified / 12
dependency certification register
Coordinator readiness
7 evaluated
operational visibility only — never ranked
Revalidation required
18 files
material change triggers observed
Executive priorities
6 active
certification queue, advisory
Transaction certification — evidence-backed verdicts
| file | property | authority | assurance | policy | dependencies | exceptions | verdict | conf |
|---|---|---|---|---|---|---|---|---|
| TX-1042 | 4417 Bellaire Dr | READY_FOR_CLOSING | 0.91 | pass 6/6 | 12/12 verified | 0 open | CERTIFIED | 90% |
| TX-1055 | 2200 Kingsway | ASSURED | 0.88 | pass 6/6 | 11/12 verified | 0 open | CERTIFIED | 87% |
| TX-1048 | 812 Cedar Ridge | UNDER_REVIEW | 0.74 | pass 5/6 | 9/12 verified | 1 curative | READY_WITH_REVIEW | 72% |
| TX-1060 | 19 Harbor Point | CLOSING | 0.69 | pass 5/6 | 10/12 verified | 1 signature | READY_WITH_REVIEW | 68% |
| TX-1067 | 9031 Sable Ct | UNDER_REVIEW | 0.55 | fail 1/6 (lien policy) | 7/12 verified | 2 open | NOT_CERTIFIED | 81% |
| TX-1051 | 77 Marigold Ln | PREPARATION | unknown | not observed | 5/12 verified | unknown | INSUFFICIENT_EVIDENCE | unknown |
| TX-1063 | 540 Alder St | INTAKE | unknown | not observed | 2/12 verified | unknown | INSUFFICIENT_EVIDENCE | unknown |
| TX-1071 | 310 Windrow Ave | OBSERVATION | 0.86 | pass 6/6 | 12/12 verified | 0 open | CERTIFIED | 85% |
Certification is a read of observed evidence at a point in time. It never advances workflow and expires on any material change.
Closing readiness — immediately before closing
| requirement | observed | verdict | cov | conf |
|---|---|---|---|---|
| Required documents | 12/12 observed on 31 files; 22 files missing ≥1 artifact | READY_WITH_REVIEW | 86% | 80% |
| Required decisions | human decision records present on 118 files | READY_TO_CLOSE | 80% | 78% |
| Required commitments | title commitment received on 126 files | READY_WITH_REVIEW | 85% | 79% |
| Required reviews | 3/3 reviews recorded on 96 files; 14 files unreviewed | READY_WITH_REVIEW | 74% | 72% |
| Required parties | buyer, seller, title, lender confirmed on 131 files | READY_TO_CLOSE | 88% | 83% |
| Required signatures | signature packets observed on 88 files | READY_WITH_REVIEW | 69% | 70% |
| Required compliance | 22 audit-evidence gaps open | BLOCKED | 66% | 71% |
| Funding evidence (published only) | published funding evidence on 41 files; TC Pros never verifies funds directly | READY_WITH_REVIEW | 62% | 67% |
| Known risks | 8 ranked risks linked to evidence | READY_WITH_REVIEW | 77% | 72% |
| Confidence | aggregate certification confidence | READY_WITH_REVIEW | 78% | 75% |
Readiness is never inferred. Missing evidence returns INSUFFICIENT_EVIDENCE, not a pass.
Operational readiness
Playbook completion
0.81
10 playbooks · 148 files
Timeline integrity
0.73
append-only timeline gaps, 90d
Coordinator coverage
0.86
every open file has a recorded owner
Exception resolution
0.68
184 exception episodes
Communication completeness
0.64
in-file capture vs external channels
Review coverage
0.71
recorded human reviews per required step
Operational capacity
0.79
load vs weighted capacity, advisory
Confidence
0.74
aggregate of observed dimensions
Compliance certification
| requirement | observed | verdict | conf |
|---|---|---|---|
| Required policies | 6 active policy versions applied to 148 files | CERTIFIED | 83% |
| Required reviews | 14 files without recorded pre-closing review | REVIEW_REQUIRED | 75% |
| Required documents | 22 files missing a required compliance artifact | REVIEW_REQUIRED | 72% |
| Required approvals | approvals recorded on 126 files | CERTIFIED | 80% |
| Required audit evidence | audit trail gaps on 22 files | BLOCKED | 70% |
| Known exceptions | 5 active certification exceptions, all with expiration | REVIEW_REQUIRED | 77% |
| Confidence | coverage below threshold on wire-verification evidence | UNKNOWN | unknown |
Compliance is never inferred. An unobserved control is UNKNOWN, never CERTIFIED.
Dependency certification
| dependency | evidence | files | verdict | conf |
|---|---|---|---|---|
| Buyer | identity + contact confirmed in file | 141 | VERIFIED | 88% |
| Seller | identity + authority to convey observed | 137 | VERIFIED | 85% |
| Title | commitment received, curative tracked | 126 | REVIEW_REQUIRED | 78% |
| Escrow | escrow opened confirmations | 144 | VERIFIED | 90% |
| Lender | 11 files without clear-to-close artifact | 103 | REVIEW_REQUIRED | 71% |
| Insurance | binder observed | 118 | VERIFIED | 80% |
| Inspection | report or waiver observed | 121 | VERIFIED | 79% |
| Appraisal | 6 files awaiting appraisal artifact | 96 | REVIEW_REQUIRED | 68% |
| Funding | published funding evidence only — never verified by TC Pros | 41 | REVIEW_REQUIRED | 62% |
| Permits | not observed for 2 land files | 12 | UNKNOWN | unknown |
| Attorney | review recorded where jurisdiction requires | 34 | VERIFIED | 81% |
| Assistant requests | handoff acknowledgements observed | 148 | VERIFIED | 86% |
Funding remains based only on published evidence. TC Pros never moves or verifies money.
Coordinator certification — operational visibility, never ranked
| coordinator | assigned | outstanding | review completion | communication | timeline health | exception resolution | conf |
|---|---|---|---|---|---|---|---|
| Coordinator A | 31 | 14 | 78% | 72% | 66% | 70% | 74% |
| Coordinator B | 24 | 6 | 90% | 84% | 83% | 81% | 82% |
| Coordinator C | 19 | 9 | 71% | 63% | 70% | 64% | 69% |
| Coordinator D | 22 | 5 | 86% | 79% | 80% | 77% | 79% |
| Coordinator E | 17 | 11 | 62% | 58% | 61% | 60% | 64% |
| Coordinator F | 21 | 7 | 80% | 74% | 75% | 72% | 75% |
| Coordinator G | 14 | 3 | unknown | unknown | 72% | unknown | unknown |
Coordinator certification exists for operational visibility. Coordinators are never ranked or scored against each other.
Closing package certification
| element | observed | verdict | conf |
|---|---|---|---|
| Documents | 12/12 required artifacts on 31 files | COMPLETE | 86% |
| Approvals | human approvals recorded | COMPLETE | 84% |
| Policies | policy versions pinned to packet | COMPLETE | 82% |
| Dependencies | 3 dependency classes in review | INCOMPLETE | 73% |
| Funding evidence | published references only, no direct verification | INCOMPLETE | 62% |
| Timeline | append-only timeline attached | COMPLETE | 80% |
| Communication | external channel gaps on 18 files | INCOMPLETE | 64% |
| Compliance | 22 audit-evidence gaps | BLOCKED | 70% |
| Known risks | 8 ranked risks referenced | COMPLETE | 75% |
| Confidence | packet confidence below threshold on 12 files | UNKNOWN | unknown |
Assistant consumes the certification packet. TC Pros never delivers it into specialist systems directly.
Revalidation triggers
Policy changes
REVALIDATION_REQUIREDwire-verification policy v3 published 2026-08-06
6 files affected
Dependency changes
REVALIDATION_REQUIREDlender changed on 2 files
2 files affected
Funding evidence changes
REVALIDATION_REQUIREDpublished funding reference superseded
3 files affected
Document changes
REVALIDATION_REQUIREDamendment recorded after certification
4 files affected
Coordinator changes
REVALIDATION_REQUIREDreassignment observed
1 files affected
Timeline changes
REVALIDATION_REQUIREDtarget close date moved ≥3d
5 files affected
Compliance changes
REVALIDATION_REQUIREDnew audit requirement applied
2 files affected
Exception changes
REVALIDATION_REQUIREDexception expired or scope widened
2 files affected
Certification never remains valid automatically. Any material change invalidates the prior certification.
Certification change impact — review before approval
| change | transactions | dependencies | coordinators | assistant requests | closing packages | revalidation | conf |
|---|---|---|---|---|---|---|---|
| Require attorney review on all creative-finance files | 38 | Attorney, Title | 5 | 38 | 38 | all 38 | 76% |
| Tighten funding-evidence freshness to 24h | 41 | Funding, Lender | 7 | 41 | 41 | all 41 | 71% |
| Add second signature verification step | 148 | Buyer, Seller, Title | 7 | 96 | 96 | 96 open packets | 68% |
| Retire legacy curative policy v1 | 22 | Title | 4 | 22 | 22 | 22 | 74% |
Transaction exception certification
| reason | scope | risk | approver | expires | compensating controls | evidence |
|---|---|---|---|---|---|---|
| Emergency closing | TX-1060 only | HIGH | Closing Director | 2026-08-12 | dual human review before signing | written approval artifact 2026-08-08 |
| Funding pending | TX-1048 | MEDIUM | Compliance Lead | 2026-08-14 | no packet delivery until published evidence | lender note observed |
| Temporary policy exception | Curative policy v1 files | MEDIUM | Policy Owner | 2026-08-31 | weekly exception review | policy review record |
| Regulatory delay | 2 land files, county permit office | LOW | Closing Director | 2026-09-15 | permit dependency stays UNKNOWN | county notice |
| Experimental workflow | Novation pilot, 4 files | MEDIUM | Operations Lead | 2026-09-01 | human approval on every step | pilot charter |
Exceptions carry an approver, expiration and compensating controls. They never silently become permanent.
Executive certification queue
Ready to certify
all 10 certification inputs observed
Needs review
≥1 input REVIEW_REQUIRED
Blocked
policy failure or unresolved lien
Funding review
published funding evidence missing or stale
Compliance review
audit evidence gaps
Dependency review
lender / appraisal artifacts outstanding
Coordinator review
outstanding tasks above observed threshold
Revalidation required
material change after certification
Transaction risk register — ranked by observed exposure
| # | risk | exposure | evidence | conf |
|---|---|---|---|---|
| 1 | Closing risk | 12 blocked files inside 10d of target close | authority ledger + timeline | 83% |
| 2 | Compliance risk | 22 files with audit-evidence gaps | compliance certification | 70% |
| 3 | Funding risk | 19 files without current published funding evidence | published evidence references only | 66% |
| 4 | Dependency risk | 17 files with outstanding lender/appraisal artifacts | dependency certification | 72% |
| 5 | Timeline risk | 5 files with target close moved ≥3d | append-only timeline | 75% |
| 6 | Coordinator risk | 2 coordinators above observed workload band | coordinator certification, advisory | 68% |
| 7 | Exception risk | 5 active exceptions, 1 high risk expiring in 4d | exception register | 77% |
| 8 | Operational risk | communication completeness at 0.64 | operational readiness | 63% |
Certification replay — append-only
TX-1042 entered PREPARATION — executed agreement artifact
System (observed)
assurance 0.71 — 2 dependency gaps recorded
Assurance engine
wire-verification policy v2 applied and pinned
Policy Owner
lender clear-to-close artifact observed
Coordinator B
audit evidence complete — 6/6 controls observed
Compliance Lead
final review recorded, packet assembled
Coordinator B
verdict CERTIFIED · confidence 0.90 · advisory only
Certification engine
funded and recorded — outcome observed, not executed by TC Pros
Title company (published)
Replay records are append-only. Historical certifications and predictions are never rewritten.
Certification calibration — predictions vs observed
| predicted | certification | observed closing | coordinator review | funding | compliance | n |
|---|---|---|---|---|---|---|
| READY_TO_CLOSE | CERTIFIED | closed on target (41/44) | agreed 39/44 | funded 44/44 | no findings | 44 |
| READY_WITH_REVIEW | READY_WITH_REVIEW | closed +2.4d median (28/37) | agreed 30/37 | funded 36/37 | 2 findings | 37 |
| BLOCKED | NOT_CERTIFIED | delayed ≥5d (11/12) | agreed 12/12 | 3 funding holds | 4 findings | 12 |
| UNKNOWN | INSUFFICIENT_EVIDENCE | not evaluated | not evaluated | not evaluated | not evaluated | 21 |
Historical predictions are never rewritten.
Cross-app handoffs — Assistant coordinates all orchestration
Certification packet
Assistant
Closing readiness
Assistant → Closing desk
Compliance evidence
Assistant → Compliance
Dependency evidence
Assistant → Connect
Funding evidence references (published only)
Assistant
When certification completes, TC Pros generates Assistant requests for approved downstream consumers. Assistant coordinates all orchestration; specialist state is never modified directly.
Transaction certification scorecards
| scorecard | observed evidence | coverage | confidence |
|---|---|---|---|
| Transactions | 148 open files, 10 certification inputs each | 84% | 79% |
| Compliance | 6 checks · 22 audit gaps | 65% | 66% |
| Dependencies | 12 dependency classes · 9 verified | 77% | 73% |
| Coordinators | 7 coordinators, operational visibility only | 72% | 70% |
| Policies | 6 active versions, pinned per packet | 81% | 78% |
| Operational readiness | 7 dimensions, 90d window | 79% | 75% |
| Certification | 24 CERTIFIED · 37 review · 12 not certified · 21 insufficient | 86% | 80% |
| Enterprise transaction certification | org-wide rollup of all certification scorecards | 74% | unknown |
Learning candidates — submitted through Assistant only
Certification pattern
route: AssistantFiles certified ≥3d before target close close on time in 93% of cases
Closing readiness pattern
route: AssistantSignature packet observed before final review removes 1.8d median delay
Compliance pattern
route: AssistantAudit evidence captured in-file eliminates post-closing findings
Coordinator pattern
route: AssistantOutstanding tasks below 8 correlates with timeline health ≥0.8
Dependency pattern
route: AssistantLender artifact requested at escrow open verifies 71% earlier
Operational readiness pattern
route: AssistantReview coverage above 0.8 predicts CERTIFIED at first evaluation
Cross-app consumption — published contracts only
| app | contract | use |
|---|---|---|
| Assistant | tc.transaction_certification_packet.v1 | orchestrates downstream closing handoffs |
| Connect | tc.dependency_certification.v1 | dependency status for partner coordination |
| Closing desk | tc.closing_readiness.v1 | pre-closing checklist evidence |
| Compliance | tc.compliance_certification.v1 | audit evidence review |
Applications consume published contracts only. No direct reads of TC Pros internals.
Published contracts — Phase 12
TC Pros owns
TC Pros does not own
Invariants
- · Assistant remains the sole orchestrator.
- · Certification never changes transaction state or closes transactions.
- · Funding verification is based solely on published evidence.
- · Every material change triggers revalidation.
- · Specialist workflow state is never modified directly.
- · Unknown remains unknown.